Project | Client | Location | Contractor Type |
---|---|---|---|
Construction of Plant Modification Projects PMP 736, PMP 768 and PMP 790 |
BOROUGE | Ruwais | Main Contractor |
EPC Project for Replacement/Upgrade of ZCSC Fuel Gas System |
ADMA-OPCO | Offshore | Main Contractor |
Modification of Piping and Replacement of Existing Flow Meter and Provision of Utility Station at the top of GPR |
BOROUGE | Ruwais | Main Contractor |
Dismantling, transportation and storage of the Written-Off Equipment in Abu Dhabi Refinery |
TAKREER | Abu Dhabi Refinery | Main Contractor |
EPC for Crossover Provision to convert 30" MP Transfer Line from MP Duty to HP Duty for ILI Pigging Activity |
GASCO | Habshan | Main Contractor |
EPC Works for Borouge PO ISO Container Storage Yard Project |
BOROUGE | Ruwais | Main Contractor |
EPC Services for Fertil Jetty Ethylene Vapor Return Arm |
BOROUGE | Ruwais | Main Contractor |
Habshan 0 & 1 HP Steam Modification (PC) |
GASCO | Habshan | Main Contractor |
Additional Handling Facilities for 10 PPM Gas Oil at Ruwais Refinery |
TAKREER | Ruwais | Main Contractor |
Labelling of Pipelines in Process Units and Offsite Areas at Abu Dhabi Refinery |
TAKREER | Umm Al Nar | Main Contractor |
Construction Works for PP Power Trimming Project |
BOROUGE | Ruwais | Main Contractor |
Special Contract of Supply of Steel Piping, Fitting and Accessories for Mobile Polished Water Injection Skid to carryout Water Injectivity Test at PW38-MRC5 |
HITACHI - ME | GOGAS Yard | Main Contractor |
Replacement of Drinking Water Pipelines in Ruwais Refinery |
TAKREER | Ruwais | Main Contractor |
Replacement of 24" Corroded Flare Line Itt No. Ftefe 1201 |
ZADCO | Zirku Island | Main Contractor |
Manufacturing of Block Branches |
BOROUGE | Ruwais | Main Contractor |
Implementation of Operational Improvement to process units at Abu Dhabi Refinery (Takreer) |
LITWIN | Abu Dhabi Refinery | Sub Contractor |
Provision of Temporary Site Execution Support for Shut Downs & Major Schemes (Offshore) on Call-Off basis |
ADMA-OPCO | Offshore | Main Contractor |
Construction Service for Concrete Insitu Casing of Borouge 2 Sea Water Basin Ruwais |
BOROUGE | Ruwais | Main Contractor |
Inspection and Maintenance of Seawater Intakes Boom Structure in GUP at Ruwais Refinery |
TAKREER | Ruwais | Main Contractor |
Foam System Replacement at Plant 27 and Jetty |
ADGAS | Das Island | Main Contractor |
Replacement of Cooling Water Piping at GG LI - ZWSC |
ADMA-OPCO | ZWSC | Main Contractor |
The Modification of Gas & Utilities Connections in Takreer Research Centre Laboratories & Pilot Plant Hall |
TAKREER | Abu Dhabi Refinery | Main Contractor |
Upgrade/Construction of Cab Kitchen and Restaurant Das Island |
ADMA-OPCO | Das Island | Main Contractor |
Replacement of Cooling Water Line at ZWSC-PGB |
ADMA-OPCO | ZWSC | Main Contractor |
Sectional Replacement of Drain GRE Headers at ASAB Rds's |
ADCO | Habshan | Main Contractor |
Fabrication of Handrails for NSP |
ZADCO | NSP | Main Contractor |
Inspection and Painting of Hydrogen Cylinders and Nitrogen Cylinders at Abu Dhabi Refinery |
TAKREER | Abu Dhabi Refinery | Main Contractor |
EPC for Provision of Accommodation in Al Jimi Camp for 2012 Plant Overhaul at Das Island |
ADGAS | Das Island | Main Contractor |
Construction of Exercise Room near Safety, Env. and Fire Department |
TAKREER | Abu Dhabi Refinery | Main Contractor |
Supply, fabrication, painting and delivery of Metal Skips |
BOROUGE | UAE | Main Contractor |
ACPT-2, Bilge Area Open Drain Piping Replacement |
ZADCO | ACPT-2 | Main Contractor |
Supply of Material & Construction of Emergency Flushing Line for South Oil Trunk Line |
ZADCO | UAE | Main Contractor |
Rerouting/Extension of Existing Waste Line Outside Takreer Mussafah Terminal |
TAKREER | Mussafah Terminal | Main Contractor |
Fabrication of Boat Fenders for WHTS US-4 to US-10 |
ADMA-OPCO | US4-US-10 | Main Contractor |
Modification required for installation of new propane compressor motor with self contained purgins system |
ZADCO | UAE | Main Contractor |
Manufacturing of Long Term Storage and Shipping Containers |
GASCO | Habshan / Bab | Main Contractor |
Replacement of Marine Loading Arm & Other Accessories in Berth B at Ruwais Refinery |
TAKREER | Ruwais Refinery | Main Contractor |
Repair, renewal of flooring, flase ceiling wall lining panel at ZWSC/ZCSC |
ADMA-OPCO | ZWSC/ZCSC | Main Contractor |
Improvement of Al Jimi Village Accommodation (ADGAS) |
ADGAS | Das Island | Main Contractor |
Upgrade of Swdp 20" Corroded Carbon Stell Dewatering Line with GRE |
ADMA-OPCO | Das Island | Main Contractor |
Train-3 Main Cryogenic Heat Exchanger (MCHE) Replacement Project, Dismantling of Mechanical, Insulation & E&I Items from old MCHE ADGAS |
ADGAS | Das Island EPC | Main Contractor |
Hiring of Manpower for six months |
ZADCO | Central Complex (Offshore) | Main Contractor |
Supply, installation, testing and commissioning of a completely New Marine Loading Arm (260-VLA-40) in Berth E at Ruwais Refinery Takreer |
TAKREER | Ruwais Jetty | Main Contractor |
Inspection of Ruwais Marine Terminal Takreer |
TAKREER | Ruwais Jetty | Main Contractor |
Inspection of Takreer GUP Sea Water Intake and Maintenance of Boom and Accessories Sand Trap Cleaning at Sea Water No. 1 & 2 in GUP Takreer Refinery |
TAKREER | Abu Dhabi Refinery | Main Contractor |
New Sulphur Rundown Line at Das Island |
ADGAS | Das Island | Main Contractor |
Replacement of Instrument Air Network at GTP & CSP in Central Complex |
ZADCO | Central Complex (Offshore) | Main Contractor |
Modification of 24" Coanda Relief Header |
ADMA-OPCO | Das Island | Main Contractor |
Replacement of Old Roof Sheets for Old BOG, VRU and Train 2 Plant 6MCR Compressor |
ADGAS | Das Island | Main Contractor |
EPC Contract for Upgrade of Corrosion Injection Skids in Das Island |
ADGAS | Das Island | Main Contractor |
Installation of MPP Package at WHPT - 04 UAD |
ZADCO | Offshore Platforms | Main Contractor |
Replacement of Fuel Gas Filter Seperator at UAD CPC on EPC Basis |
ZADCO | Offshore Platforms | Main Contractor |
Helicopter Jet Fuel Daily Tank Jettison System Modification |
ZADCO | Offshore Platforms | Main Contractor |
Installation of Sodium Hypochlorite Dosing System at NSP |
ZADCO | Offshore Platforms | Main Contractor |
Inspection and Maintenance of Oil Contaminant Boom Structure at Abu Dhabi Refinery Sea Water Outfall |
TAKREER | Abu Dhabi Refinery | Main Contractor |
Pre-fabrication of Pipe Spools for Intelligent Pigging at 19WHPTs |
ZADCO | Offshore Platforms | Main Contractor |
USSC - Installation of Atmospheric Vent for TA Glycol Generator |
ADMA-OPCO | Offshore Umm Shaif | Main Contractor |
Marine Barge Equipped with Crane Operator and Rigging Team for repair of 3 nos. Marine Jetty Loading Arm at Ruwais Refiney Jetty |
TAKREER | Ruwais Refinery | Main Contractor |
New Portacabin for Officers at ACPT-1, 2 & CC |
ZADCO | Offshore Platforms | Main Contractor |
411-K-001 Cooling Water Piping Replacement at Satah Plant in Zirku Island |
ZADCO | Zirku Island | Main Contractor |
Replacement of Oily Water Sewer System at Abu Dhabi Refinery |
TAKREER | Abu Dhabi Refinery | Main Contractor |
Quantification Works for Structural & Painting at Umm Al Dalkh WHP |
ZADCO | Offshore Platforms | Main Contractor |
Replacement of Flare Tip of 425H002B at Zirku Island |
ZADCO | Zirku Island | Main Contractor |
Chloride Guard Bed for Unit No. 13 in Ruwais Refinery |
TAKREER | Ruwais Refinery | Main Contractor |
Re-roofing of Central Workshop at Das Island |
ADGAS | Das Island | Main Contractor |
WIP-PGP Overboard Drain Lines Replacement |
ZADCO | Offshore Upper Zakum | Main Contractor |
Repair of Damaged Boat Landing at Satah WHP-2 |
ZADCO | Offshore Satah Field | Main Contractor |
Installation of New Pig Traps on 8" Oil Production Flow Line between WHPTS PS-76 & PS-84 |
ZADCO | Offshore WHPS | Main Contractor |
Replacement of Corroded Sea Water Drain Piping System (Water Injection) and Relocation of Carbon Steel Closed Drain Piping System |
ZADCO | Umm Al Dalkh Central Complex | Main Contractor |
6 Inch Bypass for Kerosene Feed Coalescer Outlet to filter in Merox Unit at Abu Dhabi Refinery |
TAKREER | Abu Dhabi Refinery | Main Contractor |
Dismantling and Removal of Redundant Fixed Equipment, Piping and Associated Accessories at Abu Dhabi Refinery |
TAKREER | Abu Dhabi Refinery | Main Contractor |
Flare / Fuel Gas Metering Facilities Installation of Ultrasonic & Orifice Type Flow Meters at CC & Satellites |
ZADCO | Central Complex (Offshore) | Main Contractor |
Replacement of 7 nos. Pedestal Crane at Takreer Marine Jetty Terminal |
TAKREER | Ruwais | Main Contractor |
Tank Bottom Plate Replacement (Crude Tank No. 1) |
ZADCO | Zirku Island | Main Contractor |
Modification of Piping System for Parallel Operation at ZADCO CPC |
ZADCO | CPC, Umm Al Dalkh (Offshore) | Main Contractor |
Procurement, install, repair & miscellaneous jobs at Ruwais Marine Jetty and Sulphur Terminal Jetty Phase II |
TAKREER | Ruwais | Main Contractor |
Debubbler Tank 8" Vent Lines Modification and Replacement of Drain Lines on Chemical Skid at CC WIP from SS to GRE |
ZADCO | Central Complex (Offshore) | Main Contractor |
Access Platforms at various plant locations, Protection Sheds, Process Lines Protection and Refurbishment of Riser Supports Arrangement |
ADGAS | Das Island | Main Contractor |
Oil Spill Containment Boom Structure Repair & Maintenance at Takreer, Umm Al Nar |
TAKREER | Umm Al Nar | Main Contractor |
Replacement of Flare Tip at Zirku Island |
ZADCO | Zirku Island | Main Contractor |
Reclamation of Land in the Sea and Construction of Marine Jetty in the reclaimed land for Private Department |
Private Dept., Abu Dhabi Government | Offshore | Main Contractor |
Al Jimi Camp Additional Accommodation (Total 30 nos. caravans installed) |
ADGAS | Das Island | Main Contractor |
Replacement of Overboard Drain Lines (20" x 24" GRE Lines) at Central Complex |
ZADCO | Central Complex (Offshore) | Main Contractor |
Demolition of Plant & Machineries at GASCO, Habshan |
GASCO | Habshan | Main Contractor |
Relocation of Warehouse (120 x 36 mm) and Misc. Civil Works in Um Al Nar Refinery |
TAKREER | Umm Al Nar | Main Contractor |
Waste Handling Facilities at Das Island |
ADGAS | Das Island | Main Contractor |
Temporary Pentane Storage Facilities and Demolition of Tank 501 & 501 at Das Island |
ADGAS | Das Island | Main Contractor |
Replacement of Fender at Production Platform in Bunduq offshore field |
BUNDUQ | Bunduq | Main Contractor |
Al Jimi Camp Additional Accommodation (Total 100 caravans installed) |
ADGAS | Das Island | Main Contractor |
Renew platform gratings in Train 1 and Train 2 |
ADGAS | Das Island | Main Contractor |
Hire of Manpower & Equipment |
ADGAS | Das Island | Main Contractor |
Refurbishment of Berthing Dolphins No. 1 & 5 at ADGAS Marine Jetty |
ADGAS | Das Island | Main Contractor |
Procurement, install, repair & painting jobs at Ruwais Marine Jetty and Sulfur Terminal Jetty |
TAKREER | Ruwais | Main Contractor |
Inspection of Marine Terminal and Sulfur Jetties |
TAKREER | Ruwais | Sub Contractor |
Fabricate & install Air Supply Manifolds at WHP's |
ZADCO | Satah Field (Offshore) | Main Contractor |
Utilization of Satah facilities. Test separator piping and commissioning at WHP 8 |
ZADCO | Satah Field (Offshore) | Main Contractor |
Utilization of Satah facilities. Test separator piping and commissioning at WHP 2, 3 & 6 |
ZADCO | Satah Field (Offshore) | Main Contractor |
Installation of 3rd Manifold |
ZADCO | Umm Al Nar (Offshore) | Main Contractor |
Salvage of Sunken Ship from Umm Al Nar Channel |
TARGET/ADWEA | Umm Al Nar (Offshore) | Main Contractor |
Dismantling / Removal of FD Fan Houses for Boilers in Train 1 & 2 |
ADGAS | Das Island | Main Contractor |
Supply, fabricate, erect, test & commission all piping related to DCS Project |
GASCO | Ruwais (Plant Piping) | Sub Contractor |
Provide WPS, PQR and carryout welding of 2 nos. C.S. Split Tee for Hot Tapping related to Installation of Fueld & Vent Gas Pipeline at ADCO |
ADCO/GASCO | Asab (Onshore Field) | Sub Contractor |
Installation of Residue Gas Line for Fire Training Ground |
GASCO | Buhassa (Onshore) | Main Contractor |
Replacement of 30" Leaking Tee. Shutdown work |
GASCO | Buhassa (Plant Piping) | Main Contractor |
Debottlenecking of MP Fuel Gas Line at GP & P Division |
ADNOC | Habshan (Plant Piping) | Main Contractor |
Inspection of Sulfur Loading Platform by Abseling |
ADGAS | Das Island | Sub Contractor |
Construction of Breakwater |
H.E. Sheikh Ahmed Bin Hamed | Mechased Island | Main Contractor |
Construction of Marine Jetty |
H.E. Sheikh Ahmed Bin Hamed | Hanoura Island | Main Contractor |
Construction of Breakwater |
Mohammed Bin Masaood | Fataer Island | Main Contractor |
Demolition of Sahil A Restaurant Building and Supporting Marine Services |
ADMA-OPCO | Das Island | Main Contractor |
Power Supply to Radar Building |
UAE Armed Forces | Al Dafra Air Base | Main Contractor |
Structural Inspection & Maintenance of Ruwais Jetty |
ADNOC | Ruwais | Sub Contractor |
Demolition of Storage Tanks |
ADMA-OPCO | Das Island | Main Contractor |
Demolition of Plant & Storage Tanks |
ADGAS | Das Island | Main Contractor |
Demolition of LPG/LNG Storage Tanks |
ADGAS | Das Island | Sub Contractor |