Project | Client | Location | Contractor Type |
---|---|---|---|
Replacement of 24" Corroded Flare Line Itt No. Ftefe 1201 |
ZADCO | Zirku Island | Main Contractor |
Fabrication of Handrails for NSP |
ZADCO | NSP | Main Contractor |
ACPT-2, Bilge Area Open Drain Piping Replacement |
ZADCO | ACPT-2 | Main Contractor |
Supply of Material & Construction of Emergency Flushing Line for South Oil Trunk Line |
ZADCO | UAE | Main Contractor |
Modification required for installation of new propane compressor motor with self contained purgins system |
ZADCO | UAE | Main Contractor |
Hiring of Manpower for six months |
ZADCO | Central Complex (Offshore) | Main Contractor |
Replacement of Instrument Air Network at GTP & CSP in Central Complex |
ZADCO | Central Complex (Offshore) | Main Contractor |
Installation of MPP Package at WHPT - 04 UAD |
ZADCO | Offshore Platforms | Main Contractor |
Replacement of Fuel Gas Filter Seperator at UAD CPC on EPC Basis |
ZADCO | Offshore Platforms | Main Contractor |
Helicopter Jet Fuel Daily Tank Jettison System Modification |
ZADCO | Offshore Platforms | Main Contractor |
Installation of Sodium Hypochlorite Dosing System at NSP |
ZADCO | Offshore Platforms | Main Contractor |
Pre-fabrication of Pipe Spools for Intelligent Pigging at 19WHPTs |
ZADCO | Offshore Platforms | Main Contractor |
New Portacabin for Officers at ACPT-1, 2 & CC |
ZADCO | Offshore Platforms | Main Contractor |
411-K-001 Cooling Water Piping Replacement at Satah Plant in Zirku Island |
ZADCO | Zirku Island | Main Contractor |
Quantification Works for Structural & Painting at Umm Al Dalkh WHP |
ZADCO | Offshore Platforms | Main Contractor |
Replacement of Flare Tip of 425H002B at Zirku Island |
ZADCO | Zirku Island | Main Contractor |
WIP-PGP Overboard Drain Lines Replacement |
ZADCO | Offshore Upper Zakum | Main Contractor |
Repair of Damaged Boat Landing at Satah WHP-2 |
ZADCO | Offshore Satah Field | Main Contractor |
Installation of New Pig Traps on 8" Oil Production Flow Line between WHPTS PS-76 & PS-84 |
ZADCO | Offshore WHPS | Main Contractor |
Replacement of Corroded Sea Water Drain Piping System (Water Injection) and Relocation of Carbon Steel Closed Drain Piping System |
ZADCO | Umm Al Dalkh Central Complex | Main Contractor |
Flare / Fuel Gas Metering Facilities Installation of Ultrasonic & Orifice Type Flow Meters at CC & Satellites |
ZADCO | Central Complex (Offshore) | Main Contractor |
Tank Bottom Plate Replacement (Crude Tank No. 1) |
ZADCO | Zirku Island | Main Contractor |
Modification of Piping System for Parallel Operation at ZADCO CPC |
ZADCO | CPC, Umm Al Dalkh (Offshore) | Main Contractor |
Debubbler Tank 8" Vent Lines Modification and Replacement of Drain Lines on Chemical Skid at CC WIP from SS to GRE |
ZADCO | Central Complex (Offshore) | Main Contractor |
Replacement of Flare Tip at Zirku Island |
ZADCO | Zirku Island | Main Contractor |
Replacement of Overboard Drain Lines (20" x 24" GRE Lines) at Central Complex |
ZADCO | Central Complex (Offshore) | Main Contractor |
Fabricate & install Air Supply Manifolds at WHP's |
ZADCO | Satah Field (Offshore) | Main Contractor |
Utilization of Satah facilities. Test separator piping and commissioning at WHP 8 |
ZADCO | Satah Field (Offshore) | Main Contractor |
Utilization of Satah facilities. Test separator piping and commissioning at WHP 2, 3 & 6 |
ZADCO | Satah Field (Offshore) | Main Contractor |
Installation of 3rd Manifold |
ZADCO | Umm Al Nar (Offshore) | Main Contractor |